Geelong Ring Road, Victoria
Design and construction of Stage 2 of the Geelong Bypass, included major earthworks, construction of 4.5km of new dual carriageway, ramps and architecturally designed noise walls constructed from weathering steel featured at specific locations along the ring road. With construction being adjacent to built up residential areas, dust, noise and community consultation management were critical success factors for this project. The contract also included the preparation, selection and planting of over 200,000 native and indigenous trees, shrubs and grasses by our in-house landscaping team.
  Client: VicRoads – Major Projects
Value: $31.6m Stage 2 (above)
Date: 2008